This is the first of two loads of 2X12 treated lumber. |
![]() |
The toughest part of this job was crawling under all of the ledgers to start and stop the generator every time i needed to make a cut with the saw. |
![]() |
This is the 2 X 12" frame work for the 2 X 10" floor joists. |
![]() |
Each of the 16 posts were cut with a chain saw to have 2 flat sides to attach the ledgers. |
![]() |
The corner post needed special attention inlaying the ledgers. |
![]() |
This represents 3 trips to the lumber yard and 12 hours of sweat equity. |