New as of 8-3-2002
 |
The generator is in place and ready to run the saws, drills etc.
|
 |
Eric has been hand digging these new holes, in clay. I have decided to expand the floor plan, now rather than later.
|
 |
The hand digging continues.
|
 |
After completing the layout and notching the poles to accept the 2x12 ledgers I noticed a termite in one of the poles. Needless to say, it was removed and this is the replacement.
|
 |
Here I am, notching the new pole.
|
 |
The temperature was well over 100 degrees and the humidity was making me melt away.
|
 |
At the end of the day we were left with lots of materials to get put away. Usually I try not to purchase any more materials then I can get installed that day. It was so hot today that we did not accomplish what I had hoped for.
|
 |
A nice shot of Eric.
|
 |
The deck area is complete. It is now about even with the creek bank.
|
 |
From this top shot you can see the additional floor space from the placement of the new holes.
|